Question Papers

Surveying-2

Previous year question paper with solutions for Surveying-2 from 2012 to 2012

Header Ads (Responsive)
Syllabus SV2 (Diploma Civil Engineering 4th)

1. Contouring: (6 Hrs.)

Concept of contours, purpose of contouring, contour interval and horizontal

equivalent, factors effecting contour interval, characteristics of contours,

methods of contouring: Direct and indirect, interpolation of contours; use of

contour map, Drawing cross section from a contour map; alignment of a

road on contour map, computation of earth work and reservoir capacity from

a contour map.

2. Theodolite Surveying: (14 Hrs.)

Working of a transit vernier theodolite, axes of a theodolite and their relation;

temporary adjustments of a transit theodolite; concept of transiting,

swinging, face left, face right and changing face; measurement of horizontal

and vertical angles. Prolonging a line (forward and backward) measurement

of bearing of a line; traversing by included angles and deflection angle

method; plotting a traverse; concept of coordinate and solution of omitted

measurements (one side affected), errors in theodolite survey.

Height of objects – accessible and non-accessible bases

3. Tacheometric surveying: (10 Hrs.)

Tacheometry, Instruments to be used in tacheometry, methods of

tacheometry, stadia system of tachometry, general principles of stadia

tachometry, examples of stadia tachometry and Numerical problems.

4. Curves: (14 Hrs.)

4.1 Simple Circular Curve:

* Need and definition of a simple circular curve; Elements of simple

circular curve - Degree of the curve, radius of the curve, tangent

length, point of intersection (Apex point), tangent point, length

Setting out of simple circular curve (No derivations, only brief description):

a) By linear measurements only:

- Offsets from the tangent

- Successive bisection of arcs

- Offsets from the chord produced

b) By tangential angles using a theodolite (with numerical problems) 

CCDCJuly, 2013 37

4.2 Transition Curve:

Need (centrifugal force and super elevation) and definition of transition

curve; requirements of transition curve; length of transition curve for roads;

by cubic parabola; calculation of offsets for a transition curve;

4.3 Vertical curve brief description only

5. Computation of Areas: (4 Hrs)

By Graphical & Instrumental Methods

Areas by use of Field Notes 

Contribute to Our Library

Help us expand our collection by uploading your question papers.

Upload PDFs or images; our team will review and publish them.

Upload Now
2012
Download